重新生产的GT05- 19X22将在5.10号生产好,精磨2000片19X22需要3天时间.精磨10000片需要7天时间.

第1个回答  2012-04-28
Reproduced GT05-19X22 will be ready on May 10, accurate grinding 2000 pieces 19X22 takes 3 days. Accurate grinding 10000 pieces takes 7 days.本回答被提问者采纳
第2个回答  2012-04-28
The remade GT05-19X22 will be ready on May 10. And the accurate grinding of 2000 pieces 19X22 will take 3 days. 10000 pieces will take 7days.
第3个回答  2012-04-28
The Re-production for GT05-19X22 will be ready on may 10th.It will take 3 days to grind the 2000 pieces at 9X22 finely.It will take 7 days to grind 10000 pieces accurately .
第4个回答  2012-04-28
Re-production of GT05-19X22 in the production of 5.10 is good, fine grinding 2000 19X22 3 days to 7 days grinding 10000.