第1个回答 2010-11-17
1. Koya Line to provide all raw materials within the company number to Ricky.
2. Ricky on this list were marked out of raw materials has a standard model of the part number, list and refresh this were input into the computer.
3. To organize a good list to print and distribute Team of the engineers.
4. Koya stock inventory to be prepared when the need PE BAG. (Scissors and stickers may also need to be prepared)
5. The engineers (including Ricky) Ricky provided a list of inventory based on inventory and production standards of raw materials model.
Operation as follows:
In their own area of responsibility, according to the material labeled material number on the card on the list, find the corresponding part number, cut the original wire and marked a good part numbers and then into the PE BAG. (Wire model of the original group of at least one visible marking, do not wire marking requirements) last on the list for registration.
6. The engineers check FileMarker describe the material recorded in the electronic version of the list in the corresponding ITEM.
7. The engineers will collect samples of the original wire, drawings and list to Ricky, Ricky is not sorted out the list of expected number of samples and print out the corresponding drawings to IQC. If future incoming, will be responsible for producing standard samples IQC .
8. To complete the model, together with drawings of a good standard of raw materials reviewed by the supervisor, if adopted, will be submitted to the DCC release IQC saved.
9. Expected the next meeting scheduled for next Monday (11/22)