我帮你
More ups and downs in the terrain, the accuracy of some of the higher mountain DTM law needed to calculate the amount of earth and stone, but should also take into account that the map itself, the amount of data, and data storage capacity will also be a big problem. Triangulated irregular network (TIN) is a digital terrain model DTM manifestations of one of the Law Department of the measured points, broken terrain, the characteristics of points in the triangular configuration network, the calculation of the regional tri-prism method in accordance with the Turkish side. TIN model is a direct use of the wild terrain feature points measured (discrete points) constructed adjacent to the triangle to form the structure of triangulated irregular network. Vis-à-vis the rules of grid, triangulated irregular network has the following advantages: triangulation of the points and lines in the distribution of density and structure can be the characteristics of the surface coordinate, direct use of raw data as a grid node; does not change the original data and accuracy; of lines can be inserted in order to preserve the topography of the key features of the original, and well adapted to complex, irregular terrain, which will be characterized by the surface thoroughly and so on. Therefore the use of DTM earthwork method significantly improved the accuracy of the calculation. As can be seen from, DTM accuracy higher law, as triangulation can be well adapted to complex, irregular terrain, in order to better express the true characteristics of the ground. However, it should be noted that the volume of earth DTM method of high accuracy, but the amount of data calculation, and use up a lot of storage space. Therefore, if the map itself on the large amount of data should consider carefully whether the use of the method.
In the strip, such as roads, drains and other suitable cross-section of earthwork volume calculation method. Section will only need to know the cross-sectional area of at both ends, so the calculation is simple. However, if the scope of a large construction site, then the workload will be for very large area, and error-prone, while a large amount of data easily in the larger calculation errors, especially in more complex terrain, the calculated error of the area be significant. Therefore, in general, cross-section is only applicable to the mountains and more elevation changes, natural land lot or more complex terrain of the area long and narrow, roads, pipelines and other narrow band applications a wide range of terrain.
For large areas of earth topography estimates as well as some small changes in gentle slope suitable venues Grid law. The basic principle is under construction to the needs of man-made earth construction site in accordance with a certain degree of horizontal and vertical spacing of the establishment of grid lines (usually horizontal and vertical spacing equal spacing), to be carved out of a number of the same size of the grid plane, grid and then all four corners of points based on the nature and design of floor elevation above sea level, the parties calculated the elevation grid nodes using the formula for calculating the size of the earth reached the size of each box, and finally to arrive at a total aggregate amount of earth works . Grid method is characterized by the adoption of breaking up the whole into the first aggregate and then broken down to solve the problem in terms of earth and stone works. Grid division of the grid with the ups and downs of the ground situation has nothing to do, you can ensure that the venue before and after the formation of formation of the district are the same, so on the ground after the formation of the venue for the slope or irregular shape, the filling volume of excavation can be calculated Grid method used. this method a small amount of data to calculate speed, save a huge amount of data storage. Grid in the implementation of the law need to pay attention to: Grid line laid to a reasonable start; Grid laid vertical and horizontal spacing to be appropriate; specific grid implementation to strengthen the management of network nodes.
Local volatility surface, the gradient is much more varied, the use of earth and stone contour line method to estimate the amount of direct manual or mechanical methods to calculate the maximum use of undulating terrain of the mountainous terrain of the larger volume of earth is more complex, could be a White scan after vector digital graphics, the use of digital mapping software engineering calculation of earthwork volume calculation functions. As the map contour lines denote the two contour lines of the Wai-resort area, two of the elevation difference between the contour lines is known, it can be obtained between these two contour lines of the earthwork, but selected contour lines must be closed. Denote the use of off-the-shelf topographic map contour lines, contour lines by first calculating the area of Wai, Wai adjacent area by contour lines and contour an average distance of the plot is between the two contour lines of the earthwork volume. Contour line method applied to the lack of data collection or to White after the vector scan data calculation method because of the accuracy of contour lines is quite low and therefore more applicable to the general project budget.本回答被网友采纳